An application of the Delphi technique to develop an activity model for the vocational-technical education consortium of states
Purpose. The purpose of the study was to develop an activity model for the Vocational-Technical Education Consortium of States (V-TECS). Studied as a part of the problem were trends in the related literature, selected operating projects across the United States, and results obtained by the use of three Delphi probes from a jury of selected experts. Information was collected from the jury concerning the relative importance of an a priori listing of activities and subactivities under realistic "IS" and idealistic "SHOULD BE" constraints. In addition, the jury responded to the chronological arrangement and sequencing of activities.
Methods. The methods used to conduct the study were: (1) development of an a priori activity model based upon the review of related literature and a study of selected projects; (2) development of an a priori master sequence chart; (3) selection of a Jury of Experts; (4) development of a Delphi instrument; (5) administration of three Delphi probes; (6) development of criteria for inclusion and exclusion of activities and sub-activities; and (7) analysis of the information collected by use of SPSs programs at The University of Tennessee Computing Center, Knoxville, Tennessee.
Finding. The finding of the study was the activity model for V-TECS which consists of 12 major activities and 47 sub-activities. The activity model provides a means of developing catalogs of performance objectives and criterion-referenced measures in occupational education on a uniform basis among the cooperating states. In addition, a master sequence chart with PERT characteristics was developed by the Jury of Experts as a guide to the systematic development of V-TECS projects.
Recommendations. The study contains six recommendations:
1. The Vocational-Technical Education Consortium of States should adopt and implement the activity model developed as a result of the study.
2. V-TECS should develop a PERT program or other project control procedure to identify the average time required to develop the products of the consortium by each activity. In addition, costs of implementing each activity should be carefully recorded and made a working part of the project control procedure. Time and cost information would enhance the management of V-TECS and the economic effectiveness of the consortium.
3. V-TECS should instigate further research of the subactivities in the activity model which have the widest variance between the realistic and idealistic ratings (IS and SHOULD BE). This variance could be an indication of the sub-activities which may be the most difficult to implement from the point of view of the Jury of Experts.
4. It is recommended that existing agencies and institutions adopt and refine the methodology used in this study for the development of models for other critical endeavors.
5. New consortium efforts should consider using the methodology in this investigation to clarify goals, specify activities and subactivities, and improve the cost-effectiveness of the consortium effort.
6. Existing consoria which are anticipating a redirection of goals should consider adopting components of the model which fit their needs and purposes.