An application of quality/cost analysis for evaluating secondary vocational-technical education programs
The purpose of this study was to (1) design a procedure amenable to determining Quality/Cost for vocational-technical education programs in Tennessee, (2) test the design by analyzing two programs, (auto mechanics and office occupations) as a means of ascertaining the benefit of each program in relationship to the cost of the programs, and (3) evaluate the results of the analysis as a means of futuristic planning for vocational-technical education programs.
Designs were presented to retrieve information related to establishing the cost for educating a pupil per contact hour. This was achieved by using data compiled from a previous study conducted by a research team which included the author. This cost factor was used as part of the input data for computing the Quality/Cost Index.
The effectiveness/cost and the benefit/cost aspects of the Quality/ Cost Analysis were computed by using a modification of the Bayesian Statistical Equation. The equation allows for the treatment of subjective data in helping educators make decisions based on probabilities or a priori rankings.
The effectiveness/cost ratios were determined by calculating the relationship between job satisfaction, which was measured by using an instrument called the Job Descriptive Index Questionnaire, and the cost per student contact hour. The benefit/cost ratios were determined by calculating the relationship between the average salary of graduates and cost per student contact hour. The effectiveness/cost ratios were employed as the prior distribution in the Bayesian formula and the benefit/cost ratios were used as the sample distribution. After treatment with the formula, the resulting ratios were interpreted as the Quality/Cost Indices.
Thesis76b.M658.pdf
5.26 MB
Adobe PDF
c4566d671b8677917e037dc5032850e6