Evaluating maintenance strategies in an electric utility
This work describes the development and use of a Monte Carlo simulation model of an electric power utility. The model permits utility management to evaluate the effects of various maintenance strategies by presenting them within cost summaries of the simulated system. The strategies include rehabilitation of generating units and varying the number of maintenance workers at various plants or areas which respond to more than one plant. Cost summaries are maintained for each plant in the system, and total costs for fuel, the work force, and net transactions with other utilities are also presented.
The model is driven by six years of historic hourly loads, which are adjusted to future loads using a predetermined forecast. The loads are met by a combination of hydro, steam, and combustion turbine generation. This combination may be supplemented by purchase or sale transactions with other utilities. These transactions include interruptible, economy, emergency and diversity. Peak shaving is also considered.
Outages occur probabalistically and man-hours of maintenance effort are required to restore the units to operating status. The work force available to supply these man-hours is dependent on the shift and the strategy under consideration. The rate at which the unit is repaired is dependent on the type of outage, the number of men who can work on the particular unit with that type of outage, and the quality of the workers.
The model is validated by comparing actual and simulated results for 1975 using the Tennessee Valley Authority Power System. A hypothetical system is developed and analyzed under different maintenance strategies.
Thesis76b.J295.pdf
7.32 MB
Adobe PDF
41075eddb511708193348967830ad032