Effect of U-236 on spent fuel values and fuel cycle costs in light water reactors
The program developed in this thesis calculates the U-236 distribution in all of the output streams from a diffusion plant for product enrichment in the light-water-reactor product enrichment range. The program's main function is to find the required penalty in dollars paid by each person who submits U-236 containing spent fuel into a diffusion plant input stream. All of the money collected as penalties is disbursed as compensation to pay each fuel owner for the extra costs of having initial U-236 in his next fuel cycle. After finding the output distribution of U-236 from the diffusion plant, the extra amount of U-235 required in each fuel to compensate for the U-236 in the fuel at BOC (beginning of cycle) is found.
The extra cost due to the extra addition of U-235 with credit for the extra U-235 at EOC (end of cycle) is found. After the extra costs due to additional U-235 are found, the penalty in $/(Gm U-236) is found for all input streams and compensation in $/(Gm U-236) is found for all output streams from the diffusion plant. Once these are found these are multiplied by the grams of U-236 in each of the input and output streams to the diffusion plant to find each penalty received by the diffusion plant and each compensation paid by the diffusion plant to the fuel owners who receive U-236 in their fuel at BOC.
Once the $/(Gm U-236) penalty is found, the penalty in mills/kWh can be found for either the cycle before the fuel goes to a diffusion plant or the cycle after the fuel comes from the diffusion plant depending on which fuel cycle corresponds to the data used in the mills/kWh calculation.
Thesis76.B445.pdf
5.42 MB
Adobe PDF
b375bc36c444bde261b7af5092781b7e