Evaluation of the Gay Street Bridge in Knoxville
The Gay Street Bridge in Knoxville, Tennessee, which spans the Tennessee River between downtown and south Knoxville was inspected and evaluated for its structural adequacy. This 1512-foot steel truss bridge was opened to traffic in 1898. Safety and economy were the two major goals in this study. It was intended to determine with some degree of certainty, the safety or lack thereof for this bridge. The amount of maintenance required and an estimate of the related costs were to be provided.
Evaluation of the Gay Street Bridge was done by means of physical inspection, structural analysis, strain measurement, and material characterization. The inspection findings resulted in recommendations regarding maintenance needs and their respective cost estimates. Assessment of structural adequacy was based on the results of stress analysis of bridge members in general and selected eyebars, strain measurement by strain gages, and chemical and mechanical tests to obtain material properties. Current developments of fracture mechanics, such as transition temperatures, correlations between impact energy (Charpy V-Notch) and fracture toughness (KIc), and critical flaw sizes without brittle fracture were all utilized in this research.
A comprehensive state-of-the-bridge investigation for the Gay Street Bridge was accomplished. It was believed that the bridge structure can be restored to a structurally adequate condition by the corrective measures recommended which only cost a moderate amount of money at this time. The critical flaw sizes established for a critical eyebar member by fracture mechanics approach were small and thus are difficult to detect. I However, the investigation of hypothetical bridge failure indicated that eyebar failure would not likely result in the sudden collapse of the suspended span of the bridge structure. As low stress in eyebar members seemed to be the only safeguard against brittle fracture, this research called for enforcement of the present load limit on the bridge. Also, it is recommended that the City should plan to build a new bridge in the next decade or so to replace the 79-year-old bridge while retaining the proposed inspection and maintenance program during this period.
Thesis77b.H673.pdf
6.53 MB
Adobe PDF
8df379e6d9324a7fa790bc01f1615478