Abstract
The basis for nuclear power plant physical security plans is deterministic and prescriptive rules. Mock challenges or tabletop exercises demonstrate that the physical security plan adequately mitigates postulated threats. The practice does not include a risk component to allow ranking of scenario attributes such as consequences, targets, adversary threats, or the establishment of a sufficiency metric. The process cannot define the most critical aspects of the physical security plan. Addressing all findings equally, without a significance metric beyond the DBT's characteristics, results in high operating costs for nuclear power plants. Other facets of nuclear power plant operation embrace a risk-informed decision-making process. The use of these processes results in considerable cost savings while maintaining adequate public safety. This research describes methods for introducing risk-informed decision-making into physical security practice. Risk-informed decision-making provides a means to optimize the physical security plan, provide insights, and serve as a platform for an adequacy metric.
Degree
Doctor of Philosophy
Major
Nuclear Engineering
File(s)![Thumbnail Image]()
Name
SUMMITT-PRIMARY-2026.pdf
Size
4.25 MB
Format
Adobe PDF
Checksum (MD5)
5218df11d78f491492ec39647a9edc65