A procedure for determining the expected number of failures of a phased mission
Date Issued
August 1, 1979
Author(s)
Montague, David F.
Advisor(s)
J. B. Fussell
Additional Advisor(s)
H. L. Dodds
E. M. Katz
P. F. Pasqua
Abstract
A procedure for determining the expected number of failures of systems undergoing phased missions is described. Approximations to this procedure are also presented. . The emergency core cooling system of a boiling water reactor is analyzed to demonstrate this methodology. The results of this analysis show that these procedures have practical application and the approximations provide a close estimate to the exact expected number of failures.
Degree
Master of Engineering
Major
Nuclear Engineering
File(s)![Thumbnail Image]()
Name
Thesis79M645.pdf
Size
2.45 MB
Format
Adobe PDF
Checksum (MD5)
4a8f497d509ffb7dac7d2b9016f73867