Installation techniques of primary measurement systems for direct-connect ground testing of gas turbine engines
Date Issued
June 1, 1979
Author(s)
Reece, Robert S.
Advisor(s)
William B. Baker Jr.
Additional Advisor(s)
Virgil K. Smith
R. L. Young
Abstract
The installation techniques and procedures that should be followed during buildup of the thrust, fuel and air-measuring systems required for direct-connect ground testing gas turbine engines are presented.
The installation techniques and procedures presented contain design, installation and operational guidelines which, if followed, will ensure accuracy and reliability in gas turbine engine test data.
Degree
Master of Science
Major
Aviation Systems
File(s)![Thumbnail Image]()
Name
Thesis79R442.pdf
Size
2.43 MB
Format
Adobe PDF
Checksum (MD5)
c030e99eeaaa8aa4c682dd25949e5ab3