Improving Production Flexibility
Date Issued
December 9, 2018
Abstract
Over the last year, Clayton has paired with the University of Tennessee in order to increase production rates at their Rutledge facility due to a high demand for their homes. Other concerns expressed by Clayton included high employee turnover, fluctuation in demand throughout the year, and lack of space within the facility. Several teams from the University were assigned to this location with the goal of observing and increasing throughput and flexibility within the facility while considering the previously stated issues.
Subjects
Disciplines
Submission Type
Pre-print
File(s)![Thumbnail Image]()
![Thumbnail Image]()
Name
0-Semester_2_Final_Presentation.pdf
Size
3.61 MB
Format
Adobe PDF
Checksum (MD5)
bf94c79de2302433ae6c7b4bee725f83
Name
Second_Semester_Final_Report.docx.pdf
Size
1.01 MB
Format
Adobe PDF
Checksum (MD5)
5cba47a5ef0c366f690bd4426a9ecbf7