Repository logo
Log In(current)
  1. Home
  2. Colleges & Schools
  3. Graduate School
  4. Masters Theses
  5. Optimizing Boat Hull and Deck Mold Storage Scheduling with Linear Programming
Details

Optimizing Boat Hull and Deck Mold Storage Scheduling with Linear Programming

Date Issued
August 1, 2014
Author(s)
Dareing, Tron Bjorn  
Advisor(s)
Rupy Sawhney
Additional Advisor(s)
H. Lee Martin
Reid Kress
Permanent URI
https://trace.tennessee.edu/handle/20.500.14382/38807
Abstract

With a wide range of products, Sea Ray uses a vast amount of large boat molds for each of the different boat models. Storing and transporting these molds can be an issue with introducing high variability in the production process. One of the largest problems deals with the utilization of the employees’ time with the large amount of boat production. Having the boat molds being ready for production is a critical part of the manufacturing of quality boats. There is non-value added time spent on preparing the molds for the lamination process and storing them in various areas. This problem arises from an unstandardized method of picking and storing hull and deck molds unrelated to the production schedule.


In order to improve this scenario, the production team needs to know what molds are needed for production, where the molds are located, and that the right maintenance has been conducted. The project scope focused on the hull and deck mold lamination process in the lamination building. This process starts from the pulling of the hull and deck molds from storage to when the part is removed from the mold and taken back to storage or production prepping. Linear programming was applied to minimize the cost of the transportation and preparation of the hull and deck molds as well as mold maintenance. Utilizing linear programing, an optimal mold storing schedule was developed based off of the production schedule and storing constraints.

After running the model, there was a direct connection between the storing of the molds and the production schedule. The same production demand for the week could change based on how the production was scheduled each day. Even though higher production yielded a higher total cost, the total cost could be decreased by having molds be continuously used for production. The model used to optimize the mold scheduling could actually be used to schedule the daily production. With the implementation of a standardized mold scheduling system, total weekly costs can be decreased as well as the non-value added time of the mold transportation and maintenance employees.

Subjects

linear programming

scheduling

optimization

operations research

Disciplines
Industrial Engineering
Degree
Master of Science
Major
Industrial Engineering
Embargo Date
January 1, 2011
File(s)
Thumbnail Image
Name

Tron_Dareing___Thesis_Rough_Draft_2.docx

Size

1.46 MB

Format

Microsoft Word XML

Checksum (MD5)

e003039511098fb2803cb0d766dbcb83

Thumbnail Image
Name

Tron_Dareing___Thesis_Rough_Draft_3.pdf

Size

977.19 KB

Format

Adobe PDF

Checksum (MD5)

421d7808fc8707e46ba42b1fed1f2ca6


University Libraries

1015 Volunteer Boulevard
Knoxville, TN 37996
865-974-4351

Map & Directions
Donate to the Libraries
  • About
  • John C. Hodges Society
  • Speaking Volumes magazine
  • Outreach
  • Directory
  • Employment
  • Policies
  • Library Intranet
University of Tennessee power T logo

The University of Tennessee, Knoxville
Knoxville, Tennessee 37996
865-974-1000

Events
A-Z
Apply
Privacy
Map
Directory
Give to UT
Accessibility

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science