  5. Mitigating Space Industry Supply Chain Risk Thru Risk-Based Analysis
Details

Mitigating Space Industry Supply Chain Risk Thru Risk-Based Analysis

Date Issued
May 1, 2023
Author(s)
Cooper, Jennifer S  
Advisor(s)
Andrew Yu
Additional Advisor(s)
Xueping Li
John E Kobza
Reza Abedi
Permanent URI
https://trace.tennessee.edu/handle/20.500.14382/29307
Abstract

Using risk-based analysis to consider supply chain disruptions and uncertainty along with potential mitigation strategies in the early stages of space industry projects can be used avoid schedule delays, cost overruns, and lead to successful project outcomes.


Space industry projects, especially launch vehicles, are complicated assemblies of high-technology and specialized components. Components are engineered, procured, manufactured, and assembled for specific missions or projects, unlike make-to-stock manufacturing where assemblies are produced at a mass production rate for customers to choose off the shelf or lot, like automobiles.

The supply chain for a space industry project is a large, complicated web where one disruption, especially for sole-sourced components, could ripple through the project causing delays at multiple project milestones. This ripple effect can even cause the delay or cancelation of the entire project unless project managers develop and employ risk mitigations strategies against supply chain disruption and uncertainty. The unpredictability of when delays and disruptions may occur makes managing these projects extremely difficult.

By using risk-based analysis, project managers can better plan for and mitigate supply chain risk and uncertainty for space industry projects to better manage project success.

Space industry project supply chain risk and uncertainty can be evaluated through risk assessments at major project milestones and during the procurement process. Mitigations for identified risks can be evaluated and implemented to better manage project success. One mitigation strategy to supply chain risk and uncertainty is implementing a dual or multi-supplier sourcing procurement strategy.

This research explores using a risk-based analysis to identify where this mitigation strategy can be beneficial for space industry projects and how its implementation affects project success. First a supply chain risk assessment and mitigation decision tool will be used at major project milestones to show where a multi-sourcing strategy may be beneficial. Next, updated supplier quote evaluation tools will confirm the usage of multiple suppliers for procurement. Modeling and simulation are then used to show the impact of that strategy on the project success metrics of cost and schedule.

Subjects

supplier selection

order optimization

space industry

risk analysis

industrial engineerin...

engineering managemen...

Disciplines
Industrial Engineering
Degree
Doctor of Philosophy
Major
Industrial Engineering
File(s)
Thumbnail Image
Name

0-Baseline_Procurement_Process_Flow_Chart.pdf

Size

51.8 KB

Format

Adobe PDF

Checksum (MD5)

d5750367fc50ed66d6924955a7fd771f

Thumbnail Image
Name

1-Dissertation_Risk_Based_Procurement_Process_Flow_Chart.pdf

Size

60.08 KB

Format

Adobe PDF

Checksum (MD5)

a7c7045e0bd33456e990b4a0a3454f9d


University Libraries

1015 Volunteer Boulevard
Knoxville, TN 37996
865-974-4351

Map & Directions
Donate to the Libraries
  • About
  • John C. Hodges Society
  • Speaking Volumes magazine
  • Outreach
  • Directory
  • Employment
  • Policies
  • Library Intranet
University of Tennessee power T logo

The University of Tennessee, Knoxville
Knoxville, Tennessee 37996
865-974-1000

Events
A-Z
Apply
Privacy
Map
Directory
Give to UT
Accessibility

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science