Repository logo
Log In(current)
  1. Home
  2. Colleges & Schools
  3. Graduate School
  4. Masters Theses
  5. Installation techniques of primary measurement systems for direct-connect ground testing of gas turbine engines
Details

Installation techniques of primary measurement systems for direct-connect ground testing of gas turbine engines

Date Issued
June 1, 1979
Author(s)
Reece, Robert S.
Advisor(s)
William B. Baker Jr.
Additional Advisor(s)
Virgil K. Smith
R. L. Young
Permanent URI
https://trace.tennessee.edu/handle/20.500.14382/53880
Abstract

The installation techniques and procedures that should be followed during buildup of the thrust, fuel and air-measuring systems required for direct-connect ground testing gas turbine engines are presented.

The installation techniques and procedures presented contain design, installation and operational guidelines which, if followed, will ensure accuracy and reliability in gas turbine engine test data.

Degree
Master of Science
Major
Aviation Systems
File(s)
Thumbnail Image
Name

Thesis79R442.pdf

Size

2.43 MB

Format

Adobe PDF

Checksum (MD5)

c030e99eeaaa8aa4c682dd25949e5ab3


University Libraries

1015 Volunteer Boulevard
Knoxville, TN 37996
865-974-4351

Map & Directions
Donate to the Libraries
  • About
  • John C. Hodges Society
  • Speaking Volumes magazine
  • Outreach
  • Directory
  • Employment
  • Policies
  • Library Intranet
University of Tennessee power T logo

The University of Tennessee, Knoxville
Knoxville, Tennessee 37996
865-974-1000

Events
A-Z
Apply
Privacy
Map
Directory
Give to UT
Accessibility

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science