  5. A Computer Modeling Approach Using Critical Resource Diagramming Network Analysis in Project Scheduling
Details

A Computer Modeling Approach Using Critical Resource Diagramming Network Analysis in Project Scheduling

Date Issued
December 1, 2004
Author(s)
Delgado, Vincent Gilles
Advisor(s)
Adedeji B. Badiru
Additional Advisor(s)
Mandyam Srinivasan
Fong-Yuen Ding
Permanent URI
https://trace.tennessee.edu/handle/20.500.14382/40817
Abstract

The problem of resource constrained project scheduling (RCPSP) continues to be an important topic in project management. Different scheduling processes have been introduced to solve cases of RCPSP. Most of the developed methods are based on a network analysis approach. The two main technique of project network analysis used for planning, scheduling, and control are PERT and CPM. These approaches assume unlimited resource availability in project network analysis. In realistic projects, both the time and resource requirements of activities should be considered in developing network schedules. Another particularity of the methods created, so far, is the focus on activities during the scheduling process. Therefore, from a resource point of view, the current procedures do not allow the project manager to incorporate information concerning each resource unit under supervision in the scheduling process of a project. There is a need for simple tools for resource planning, scheduling, tracking, and control.


Critical resource diagramming (CRD) is a relatively new resource management tool. CRD is a simple extension to the CPM technique developed for resource management purposes. Unlike activity networks, CRD uses nodes to represent each resource unit. Also, contrasting with activities, a resource unit may appear more than once in a CRD network, specifying all different tasks to which a particular unit is assigned. Similar to CPM, the same backward and forward computations may be performed to CRD.

The CRD method can also be used in solving RCPSP problems. This present study explores that advantage of CRD. The purposes are to develop a methodology, based on CRD, which allows its use in specific case of RCPSP, to implement the developed technique using a computer model, to conduct test to validate the CRD computer model, and then to investigate the advantages and disadvantages of the introduced method. The CRD computer model will be implemented using the Visual Basic 6.0 language.

Disciplines
Industrial Engineering
Degree
Master of Science
Major
Industrial Engineering
Embargo Date
December 1, 2004
File(s)
Thumbnail Image
Name

DelgadoVincentGilles_2004_OCRed.pdf

Size

4.93 MB

Format

Adobe PDF

Checksum (MD5)

09d2e057d9bd0a8d1cd75e87652868f0


University Libraries

1015 Volunteer Boulevard
Knoxville, TN 37996
865-974-4351

Map & Directions
Donate to the Libraries
  • About
  • John C. Hodges Society
  • Speaking Volumes magazine
  • Outreach
  • Directory
  • Employment
  • Policies
  • Library Intranet
University of Tennessee power T logo

The University of Tennessee, Knoxville
Knoxville, Tennessee 37996
865-974-1000

Events
A-Z
Apply
Privacy
Map
Directory
Give to UT
Accessibility

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science