Repository logo
Log In(current)
  1. Home
  2. Colleges & Schools
  3. Graduate School
  4. Masters Theses
  5. Practical Methods for Optimizing Equipment Maintenance Strategies Using an Analytic Hierarchy Process and Prognostic Algorithms
Details

Practical Methods for Optimizing Equipment Maintenance Strategies Using an Analytic Hierarchy Process and Prognostic Algorithms

Date Issued
May 1, 2017
Author(s)
Bosco, Gregory Michael  
Advisor(s)
Jamie B. Coble
Additional Advisor(s)
Belle Upadhyaya
Mingzhou Jin
Permanent URI
https://trace.tennessee.edu/handle/20.500.14382/40898
Abstract

Many large organizations report limited success using Condition Based Maintenance (CbM). This work explains some of the causes for limited success, and recommends practical methods that enable the benefits of CbM. The backbone of CbM is a Prognostics and Health Management (PHM) system. Use of PHM alone does not ensure success; it needs to be integrated into enterprise level processes and culture, and aligned with customer expectations. To integrate PHM, this work recommends a novel life cycle framework, expanding the concept of maintenance into several levels beginning with an overarching maintenance strategy and subordinate policies, tactics, and PHM analytical methods. During the design and in-service phases of the equipment’s life, an organization must prove that a maintenance policy satisfies specific safety and technical requirements, business practices, and is supported by the logistic and resourcing plan to satisfy end-user needs and expectations. These factors often compete with each other because they are designed and considered separately, and serve disparate customers. This work recommends using the Analytic Hierarchy Process (AHP) as a practical method for consolidating input from stakeholders and quantifying the most preferred maintenance policy. AHP forces simultaneous consideration of all factors, resolving conflicts in the trade-space of the decision process. When used within the recommended life cycle framework, it is a vehicle for justifying the decision to transition from generalized high-level concepts down to specific lower-level actions. This work demonstrates AHP using degradation data, prognostic algorithms, cost data, and stakeholder input to select the most preferred maintenance policy for a paint coating system. It concludes the following for this particular system: A proactive maintenance policy is most preferred, and a predictive (CbM) policy is more preferred than predeterminative (time-directed) and corrective policies. A General Path prognostic Model with Bayesian updating (GPM) provides the most accurate prediction of the Remaining Useful Life (RUL). Long periods between inspections and use of categorical variables in inspection reports severely limit the accuracy in predicting the RUL. In summary, this work recommends using the proposed life cycle model, AHP, PHM, a GPM model, and embedded sensors to improve the success of a CbM policy.

Subjects

Analytic Hierarchy Pr...

Optimizing Equipment ...

Prognostic Algorithms...

Disciplines
Nuclear Engineering
Degree
Master of Science
Major
Nuclear Engineering
Embargo Date
January 1, 2011
File(s)
Thumbnail Image
Name

G_Bosco_Thesis__4_10_17_update_.pdf

Size

5.48 MB

Format

Adobe PDF

Checksum (MD5)

56c747dc337044023bdeae2a0ac28b6c

Thumbnail Image
Name

G_Bosco_Thesis__Last_Update_2_4_17_.docx

Size

3.15 MB

Format

Microsoft Word XML

Checksum (MD5)

cffc171435d6e5d111216e7a21bff170


University Libraries

1015 Volunteer Boulevard
Knoxville, TN 37996
865-974-4351

Map & Directions
Donate to the Libraries
  • About
  • John C. Hodges Society
  • Speaking Volumes magazine
  • Outreach
  • Directory
  • Employment
  • Policies
  • Library Intranet
University of Tennessee power T logo

The University of Tennessee, Knoxville
Knoxville, Tennessee 37996
865-974-1000

Events
A-Z
Apply
Privacy
Map
Directory
Give to UT
Accessibility

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science