Analysis of claims in highway construction

Date Issued
August 1, 2000
Author(s)
Lawson, Chad D.
Advisor(s)
James H. Deatherage
Additional Advisor(s)
Edwin G. Burdette, David W. Goodpasture
Permanent URI
https://trace.tennessee.edu/handle/20.500.14382/46052
Abstract

Today's construction industry is fast paced, complex, and expensive. Unfortunately, there exist many instances when a project falls behind schedule. Disputes often arise as a result of tight budgets. Contractors normally file claims against the owners in order to recover lost time and money. Although owners and contractors try to settle disagreements as quickly as possible, there are times when a solution cannot be reached to satisfy both parties. Thus, claims management has become an important part of the construction industry. The task of analyzing a construction claim is not easily accomplished. The purpose of this study is to develop an analysis procedure for delay claims. With each claim being unique, the analysis procedure discussed m this thesis is presented in a broad sense. However, there is a detailed discussion of indirect job costs, and, more specifically, home office overhead costs. The focus of the procedure is to provide owners with methods to calculate home office overhead. This topic is approached by the use of examples related to home office overhead calculations.

Degree
Master of Science
Major
Civil Engineering
File(s)
Thumbnail Image
Name

Thesis2000.L395.pdf

Size

1.25 MB

Format

Unknown

Checksum (MD5)

4e26f02af6f4ff2e41a75aa8faa8f90a

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Privacy policy
  • End User Agreement
  • Send Feedback
  • Contact
  • Libraries at University of Tennessee, Knoxville
Repository logo COAR Notify