Abstract

Downtime is a major issue for manufactures. Downtime may occur from breakdowns, quality issues, lack of manpower, lack of materials, or in this case a lack of storage containers. A manufacturing system was studied that consists of an injection machine that supplies two assembly lines. The injection machine suffered from frequent downtime from lack of containers. The process was analyzed for root cause of downtime. After analysis of the system it was found that the injection process had high variability in production quantity and quality. The scheduling scheme called for production until all available containers were full regardless of actual demand. This created times when Injection would have to wait for Assembly to empty containers thus causing downtime. A production model was developed to compare different scheduling schemes for cost effectiveness. An economic order quantity based schedule was found to have least cost.

Subjects

lean

manufacturing

assembly

scheduling

container

downtime

Disciplines
Industrial Engineering
Degree
Master of Science
Major
Industrial Engineering
Embargo Date
January 1, 2011
File(s)
Thumbnail Image
Name

JamesDavisThesis7.pdf

Size

784.21 KB

Format

Adobe PDF

Checksum (MD5)

6cee123f0e8c3a522ace8e9258d8acca

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Privacy policy
  • End User Agreement
  • Send Feedback
  • Contact
  • Libraries at University of Tennessee, Knoxville
Repository logo COAR Notify